NOTE: KD - Again tapes are one day off. This is an observer mistake with problem continuing through the end of the run. Tapes for May 6 are labeled as May 5 date. Tapes to the end of the run were sequenced in order of continuation instead of month day. 05/06/01/ 13:47:47 -- Advanced Stokes Polarimeter Observer's Log oscar:/d/asp/Logs/01.05.06_1 Operator: KD Other observers: Joe/Doug Bert wavelength: 630 BERT DET_A Tape: co 10505-0 BERT DET_B Tape: co 10505-1 _____________________________________________________________ 05/06/01/ 13:57:45 -- Operation 1 Map: 240 steps of .60 arcsec each File Mark 05/06/01/ 14:20:18 -- Comment ar 9445..240 step map seeing fair. AO with tip/tilt _____________________________________________________________ 05/06/01/ 14:30:13 -- Operation 2 Map: 240 steps of .60 arcsec each File Mark 05/06/01/ 14:50:29 -- Comment second positioning in ar 9445. Seeing getting worse..~.7-1.4 05/06/01/ 15:01:16 -- Advanced Stokes Polarimeter Observer's Log oscar:/d/asp/Logs/01.05.06_3 Operator: KD Other observers: Joe/Doug Bert wavelength: 630 BERT DET_A Tape: co 10505-0 BERT DET_B Tape: co 10505-1 _____________________________________________________________ 05/06/01/ 15:02:58 -- Operation 3 Map: 240 steps of .60 arcsec each File Mark 05/06/01/ 15:23:22 -- Comment Last of the 240 step scans of ar9445 seeingg .8 - 1.6 _____________________________________________________________ 05/06/01/ 15:36:46 -- Operation 4 Map: 1 of 6, 120 steps of .60 arcsec each Start of short cadence maps of small part of active region File Mark _____________________________________________________________ 05/06/01/ 15:47:05 -- Operation 5 Map: 2 of 6, 120 steps of .60 arcsec each File Mark _____________________________________________________________ 05/06/01/ 15:57:09 -- Operation 6 Map: 3 of 6, 120 steps of .60 arcsec each File Mark _____________________________________________________________ 05/06/01/ 16:07:16 -- Operation 7 Map: 4 of 6, 120 steps of .60 arcsec each File Mark _____________________________________________________________ 05/06/01/ 16:17:24 -- Operation 8 Map: 5 of 6, 120 steps of .60 arcsec each File Mark _____________________________________________________________ 05/06/01/ 16:27:32 -- Operation 9 Map: 6 of 6, 120 steps of .60 arcsec each File Mark _____________________________________________________________ 05/06/01/ 16:42:26 -- Operation 10 Cal: 69 configurations File Mark _____________________________________________________________ 05/06/01/ 17:05:55 -- Operation 11 Flat Field: 32 configurations File Mark 05/06/01/ 20:37:22 -- Comment Laser calibration sequence will start with metalized ND of 5.0 For this series, a half wave plate is used to balance signal to Bert A and B via ASP phase. _____________________________________________________________ 05/06/01/ 20:51:27 -- Operation 12 Map: 10 steps of .00 arcsec each File Mark ND 5=4+1 _____________________________________________________________ 05/06/01/ 20:53:47 -- Operation 13 Map: 10 steps of .00 arcsec each File Mark ND 4.5=4+.5 _____________________________________________________________ 05/06/01/ 20:55:47 -- Operation 14 Map: 10 steps of .00 arcsec each File Mark ND4 _____________________________________________________________ 05/06/01/ 21:00:59 -- Operation 15 Map: 10 steps of .00 arcsec each File Mark ND 3.5=2+1+.5 _____________________________________________________________ 05/06/01/ 21:03:30 -- Operation 16 Map: 10 steps of .00 arcsec each File Mark ND 3=2+1 _____________________________________________________________ 05/06/01/ 21:05:47 -- Operation 17 Map: 10 steps of .00 arcsec each File Mark ND 2.5=2+.5 _____________________________________________________________ 05/06/01/ 21:08:01 -- Operation 18 Map: 10 steps of .00 arcsec each File Mark ND 2 _____________________________________________________________ 05/06/01/ 21:11:22 -- Operation 19 Map: 10 steps of .00 arcsec each File Mark ND 1.5=1+.5 File Mark File Mark